Having a new wastewater treatment plant in only one day

Your new wastewater treatment plant will be delivered and is ready to be installed. The team of service technicians briefly inform you again about the time flow of the upcoming work of installation.

The dump is lifted out right at the place determined during talks with your consultants with the help of a small excavator.

It is time for action! The small excavator places the siClaro® small wastewater treatment plant in position in the dump.

The plant as well as the wastewater inlet and outlet pipes are installed.

The necessary seepage or the outlet to an existing discharge system is passed. The positions of the pipes were already determined during talks with your consultant.

siClaro® is ready for use. The control system is installed. All necessary connecting pipes were installed by the team of service technicians. The installation site will be cleared.